The refurbishment concerns the two levels, Level 0 and Level 1, which have commercial use. The interventions include the construction of a new floor, ceiling, a gate between the two commercial areas, new claddings, new sitting benches and finally removal of the fountain in "HUB" area and the construction of new water feature.The purpose of the new proposal was the introduction of a unified design in both areas and the simplification of individual morphological elements.
The new floors were designed in three zones, starting from the entrance in "Fashion Street" and ending at "Hub".Ceramic tiles in three shades were selected, while in Level 1 and in the perimeter of the balconies and bridges kerlite tiles were placed.The ceiling of "Fashion Street", in the central double height part, consists of three rows of metal blinds in five shades of gray. The middle row consists of blinds of various heights, among which illuminated polycarbonate sheets are placed.